2nd owner since 2014, it is No. 5 in the series.
A lot of work was done on site to refit, overhaul inverters and engines brought to zero hours (they had 1,700 hours).
2025 6 new batteries, engine service, hull - bath overhaul
2024 Flap piston overhaul, new internal sockets, led lights, overhaul of electrical equipment, window covers, bathroom water pump overhaul, air conditioning in all rooms, overhaul of fire extinguishers - New charger - New awnings
2023 Air conditioning in aft cabin, toilet pump replacement
WORKS CARRIED OUT 2022:
HULL: completely repainted white/grey HULL: totally overhauled, the old antifouling removed, the negative osmosis check was carried out, 3 coats of gelshid (primer) was applied and 2 coats of antifouling was applied. FASCIAMI: The various governors have been checked. BILGES: of all bilges total stern, engine room, central part and bow. OPERA VIVA: polishing to all parts GRP and Aluminium, 2021 replacement of the porthole above the owner's room and half of the interior ceiling. CLEANING: Internal cleaning, cleaning of cushions, sofas, mattresses and oil dyeing for teak and arrangement of teak profiles PROPELLERS AND AXLES: Overhauled and checked for perfect rotation. On-axis transmission. RUDDERS: Overhauled FLAP: Overhauled pistons BOW THRUSTER: CT125 Max Power thrust 115kg thrust installed, for boats from 13 to 26 meters, this to have more power in case of very strong winds. ELECTRICAL PARTS: A global check of all electrical parts has been carried out, from navigation lights, to instruments connected to the engine such as water temperature, fuel, oil, tachometer. 2 new hour counters installed, the LED light system changed.
ALL WORK IS DOCUMENTED
2021 Axles and rudders were dismantled and Besenzoni gangway was installed - 4 fuel tanks were cleaned and the 2 litres connected to them were replaced.
2017/2020 hull brought back to zero, Rina renewed, replacement of all pumps, tank cleaning, generator, batteries, bow thruster, Raymarine Es78, redone interiors and boat cover tags.