The Azimut 116 "Momento" is an impressive 35.53-metre luxury motor yacht, built in 2006 by Azimut, combining elegant Italian design with generous spaces and outstanding onboard comfort. She accommodates up to 10 guests in 5 cabins, with separate crew quarters for up to 6 people in 3 cabins.
Powered by twin MTU V16 2000 M91 engines delivering 2,000 HP each, she features an extensive range of onboard equipment and has benefited from numerous upgrades, maintenance works and technical improvements over the years.
MAIN OPTIONS & EQUIPMENT
- Twin MTU V16 2000 M91 engines – 2 × 2,000 HP
- 2 × Kohler 65 kW generators
- 5 guest cabins + 3 crew cabins
- Air conditioning throughout
- Saim Marine stabilizers
- 100 HP bow thruster
- Idromar watermaker – 1,220 l/h
- Raymarine navigation and radar equipment
- Retractable flybridge soft-top roof
- Hydraulic gangway
- SONOS entertainment system and TVs throughout
- Jet skis and tender
Please refer to the following list for a detailed overview of the yacht's improvements and maintenance history.
-------------------------------------------------------------------------------------------
LIST OF IMPROVEMENTS – AZIMUT 116 "MOMENTO"
2016
May 2016 – Aft hatch door (swimming platform): overhauled.
June 2016 – All electronics renewed.
June 2016 – Interior and exterior lighting replaced with LED lights.
June 2016 – New shore power cables.
June 2016 – New washing machine.
June 2016 – New garage closing mechanism.
June 2016 – New Jet Ski.
June 2016 – New navigation equipment.
June 2016 – New TVs in saloon and all cabins.
June 2016 – New SONOS audio system in saloon and all cabins.
June 2016 – New master cabin mattress.
June 2016 – New VIP main deck mattress.
June 2016 – New VIP main deck carpet.
June 2016 – New forward VIP cabin blinds with remote control and blackout.
June 2016 – New master cabin blinds with remote control and blackout.
June 2016 – New towels and bedding.
2017
February 2017 – New anchor drives.
February 2017 – New WaveRunner.
June 2017 – All-new wooden blinds in cabins and saloon.
2018
March 2018 – New dryer.
March 2018 – New air conditioning in master cabin.
March 2018 – New air conditioning in captain's cabin.
March 2018 – New air conditioning in crew cabin.
March 2018 – Starboard main engine serviced at 4,000 hours.
March 2018 – Port main engine serviced at 4,000 hours.
March 2018 – Starboard generator serviced at 10,000 hours.
March 2018 – Port generator serviced at 10,000 hours.
March 2018 – Full service of all air conditioning units.
March 2018 – Saloon table refitted with new wooden top.
March 2018 – New shower flooring.
March 2018 – Aft main deck table refitted with new wooden top.
March 2018 – Shafts and propellers serviced and laboratory-balanced.
March 2018 – Galvanized anchor chains.
March 2018 – All pumps serviced.
March 2018 – Aft gangway fitted with new teak and new hydraulic hoses.
March 2018 – Black and grey water tanks serviced and cleaned.
2019
February 2019 – Watermaker refitted with new pump and membranes.
April 2019 – New retractable flybridge roofs.
April 2019 – New 75 kVA shore power converter.
2022
April 2022 – Starboard generator overhauled.
April 2022 – Port generator overhauled.
April 2022 – Full service of shafts and propellers.
April 2022 – New shaft seals and bearings.
April 2022 – Flybridge deck floor repainted.
April 2022 – New pistons for stabilizer track system.
April 2022 – All pumps serviced.
April 2022 – Hull painted.
June 2022 – New liferafts.
2023
March 2023 – New diesel, grey water and black water sensors.
March 2023 – New underwater lights.
March 2023 – New washing machine.
March 2023 – Flybridge deck floor repainted.
March 2023 – Hull repainted.
March 2023 – New starboard anchor chain.
March 2023 – Propellers serviced and laboratory-balanced.
March 2023 – Shafts and propellers treated with Propspeed.
March 2023 – New mechanism for aft retractable flybridge roof.
March 2023 – Two new hot water boilers.
March 2023 – New saloon and dining room carpets.
March 2023 – Eight new service batteries.
March 2023 – New stove and extractor hood.
April 2023 – Full service of black water, grey water, fresh water and bilge pumps.
April 2023 – New flybridge Jacuzzi pump.
April 2023 – New interior and exterior upholstery.
2024
April 2024 – New MTU engine batteries and electronics.
April 2024 – New generator batteries.
April 2024 – New bow thruster electric motor.
May 2024 – New Yamaha SuperJet Hamaya.
May 2024 – New 40 hp Yamaha dinghy outboard engine.
June 2024 – Three new Frigomar chillers, total capacity 210,000 BTU.
June 2024 – New dishwasher.
June 2024 – New induction cooktop.
June 2024 – New flybridge refrigerator.
2025
February 2025 – New high-pressure hydraulic oil pipes for trolleys and stern door.
February 2025 – New mechanical seal and gangway piston mechanism.
March 2025 – New cooling pump for the escape system.
May 2025 – New cooling oil pump for zero-speed system.
June 2025 – New Yamaha JetBlaster.
September 2025 – Main engine seawater valves overhauled.
September 2025 – Seawater valves and generators overhauled; services and renewals carried out.
September 2025 – New gangway chain mechanism and steel cover.
September 2025 – One underwater light overhauled.
September 2025 – New electric motor for stern hatch hydraulic pump.
October 2025 – New stainless steel pipes and generator exhaust valves.
October 2025 – Liferafts inspected and recertified.
November 2025 – New generator through-hull exhaust fittings.
December 2025 – Full service and inspection certification for portable CO₂ and powder fire extinguishers.
2026
January 2026 – Partial renewal of electrical system for engine room lighting and crew cabins.
January 2026 – Two new hot water recirculation pumps and circuit.
February 2026 – Black and grey water tank level floats serviced.
February 2026 – Two fresh water pumps for air conditioning overhauled.
February 2026 – Propellers ground and laboratory-balanced.
March 2026 – Watermaker fitted with new membranes.
March 2026 – Three new boiler heating elements and anodes.
March 2026 – New searchlight.
March 2026 – Fourteen new batteries: eight service batteries, four engine batteries and two MTU batteries.
March 2026 – New teak on stern platform.
April 2026 – All pumps overhauled and renewed as required.
May 2026 – New pantry and kitchen flooring.
May 2026 – New engine room access staircase.
May 2026 – New insulation for generator panels.
May 2026 – New teak shower gratings.
May 2026 – Ice maker pumps serviced.
May 2026 – Stern platform and exhausts repainted.
May 2026 – Four new curtain motors in master and VIP cabins.
May 2026 – Hull and superstructure polished.
May 2026 – New stainless steel Boston tank.
May 2026 – New hot water circuit pipes.
June 2026 – Four resin repairs to the Boston hull.
June 2026 – Partial restoration of the Boston electrical circuit.
2026 – Various additional works carried out as part of ordinary maintenance.
August 2026 – New cardan shaft joint on port main engine.
October 2026 – New Panamera 100 tender, 12.80 m, powered by 2 × 400 hp Mercury engines.
RUNNING HOURS – SEPTEMBER 2026
Starboard main engine: 8,529 hours.
Port main engine: 8,572 hours.
Starboard generator: 3,415 hours.
Port generator: 3,415 hours.