Navigation equipment
AIS
Autopilot
5 x Chartplotter (3 Gramin and 2 Furuno)
Compass
Depth Sounder
Display
DSC vhf
Electronic engine control
GPS
Intercom
Log
Odometer
Radar (Furuno)
Radar Antenna
Rudder angle indicator
VHF Radio (Furuno)
Wind Station (B&G)
Staging and technical
Anchor
Auto Dynamic Trim Interceptor
Automatic Bilge Pump
Batteries
Battery charger
Bilge Alarm
Bow Thruster
Bow Winches
cockpit table
Courtesy Lights
Deck Shower
Directional Spotlight
Electric Bilge Pump
Electric Windlass
Engine Alarm
Fire Extinguishing System
Flaps Indicators
Fume/Gas Detector
Gangway (Hydraulic)
Horn
Manual Bilge Pump
Platform
Rollbar
Shorepower connector
Side door
2 x Stern Winches
swimming ladder
Teak Cockpit
Tender Crane
Tender Garage
Voltage Rectifier
Washbasin in the cockpit
Water harbor connector system
Water pressure pump
Winch Electric
Domestic Facilities onboard
220V Outlets
Air Conditioning
BBQ/Grill
Black Water Tank
Electric Toilet
Inverter
Warm Water System
Waste Water Plant
Watermaker (Idromar 130l/h 19 hours)
Entertainment
DTV
Hi-Fi
Home Theater (Bose)
Radio AM/FM
Satellite Decoder
Satellite TV antenna
Speakers
TV
TV Ready
Kitchen and appliances
Burner
Ceramic hot plate
Deck Refrigerator
Dishwasher
Freezer
Galley
Oven
Refrigerator
Washer dryer (Miele)
Upholstery
Bimini
Bow Cushions
Cockpit Cover
Cockpit Cushions
Cushions
Instrument Cover
Sprayhood
Stern Cushions
Window Cover
Accessories notes
Works 2023:
- Engine service in April 2023
- Replacement of right engine turbines and intercooler
- Overhaul of the exhaust gas crossbar with replacement of the two right engine bends
- Replacement of Arneson high pressure hoses
- New teak cockpit
- New teak gangway
- New teak platform and steps
- Overhaul Onan 17.5Kw generator
- New Idromar watermaker 130 l/h with 19 hours
- UV water filter installation
- New boiler
- AIS installation
- New upholstery
- Replacement of internal and external LED lights bulbs
Works 2022:
- Sanding hull
- New seacocks
- Arneson service and new rubber bellows
Works 2020:
- New Kohler generator 20Kw
Works 2018:
- Total repainting of the hull and superstructure
Works 2015:
- Both engines landed
- Disassembly of supercharger air manifolds, exhaust manifolds, heads, injection pumps and injectors, turbines. Cleaning of all disassembled parts
- Turbine overhaul with replacement of the 4 compressor impellers, bearings and an exhaust scroll, overhaul of heads with surface grinding, replacement of both exhaust and intake valve seats, valves and most of the valve guides, replacement of an exhaust gas curve
- Installed new valve bridges proceeding with the update of the 2000 HP type engines.
- Replacement of injection pumps and injectors
- Disassembly of connecting rods and pistons, liners, cleaning of the block, reassembly of new liners, with new pistons equipped with floating ring, proceeding with the updating of the 2000 HP type engines
- Replacement of all connecting rod bearings and connecting rods
- Disassembly of the lubrication oil pump, cleaning and reassembly with replacement of bypass valves.
- Disassembly of diesel fuel rail, cleaning, replacement of pressure regulator valve.
- Removing and cleaning the intercooler
- Overhaul of starter motors, cleaning of exhaust manifolds and replacement of seals
- Dyno test to check engine power which turns out to be 1343Kw per engine